The National Security Agency's $2 billion mega spy center is going up in flames.

Quote
Technical glitches have sparked fiery explosions within the NSA's newest and largest data storage facility in Utah, destroying hundreds of thousands of dollars worth of equipment, and delaying the facility's opening by one year.

And no one seems to know how to fix it.

For a country that prides itself on being a technology leader, not knowing the electrical capacity requirements for a system as large as this is inexcusable.

Within the last 13 months, at least 10 electric surges have each cost about $100,000 in damages, according to documents obtained by the Wall Street Journal. Experts agree that the system, which requires about 64 megawatts of electricity—that's about a $1 million a month energy bill--isn't able to run all of its computers and servers while keeping them cool, which is likely triggering the meltdowns.

The contractor that designed the flawed system—Pennsylvania-based Klingstubbins--said in a statement that it has "uncovered the issue" and is working on "implementing a permanent fix."

But that's not the case, according to the Army Corps of Engineers (ACE), which is in charge of overseeing the data center's construction. ACE disagreed with the contractor and said the meltdowns are "not yet sufficiently understood."

A report by ACE in the Wall Street Journal said the government has incomplete information about the design of the electrical system that could pose new problems if settings need to change on circuit breakers. The report also said regular quality controls in design and construction were bypassed in an effort to "fast track" the project.

The facility—named the Utah Data Center—is the largest of several new NSA data centers central to the agency's massive surveillance program that was exposed by former NSA contractor turned leaker Edward Snowden earlier this year.

O Schadenfreude, O Schadenfreude .....

Sooo, the giant data collection center intended to store all of our communications was put together by the same type of bunch that sca-rewed up the Obamacare websites.
"Under certain circumstances, profanity provides a relief denied even to prayer." - Mark Twain

"Let us assume for the moment everything you say about me is true. That just makes your problem bigger, doesn't it?"

Offline OldSailor

  • Full Member
  • ***
  • Posts: 226
  • The world is sick and getting sicker.
Re: $2 Billion NSA Spy Center is Going Up in Flames
« Reply #1 on: October 10, 2013, 05:14:59 AM »
Sooo, the giant data collection center intended to store all of our communications was put together by the same type of bunch that sca-rewed up the Obamacare websites.

So it seems.  Remember, all of that equipment and the technical expertise is being provided, installed and maintained by the lowest bidder.   ::thumbsup::
"In it's most basic form the right to keep and bear arms is nothing less than the right to maintain the means of one's own self-defense. If a man chooses not to arm himself, that is his choice and right. It is NOT his right to force his choice upon me." - Me

Offline Libertas

  • Conservative Superhero
  • *****
  • Posts: 63663
  • Alea iacta est! Libertatem aut mori!
Re: $2 Billion NSA Spy Center is Going Up in Flames
« Reply #2 on: October 10, 2013, 07:35:01 AM »
"not yet sufficiently understood."

 ::hysterical::
We are now where The Founders were when they faced despotism.

Offline Weisshaupt

  • Conservative Superhero
  • *****
  • Posts: 5731
Re: $2 Billion NSA Spy Center is Going Up in Flames
« Reply #3 on: October 10, 2013, 08:44:36 AM »
It could very well be sabotage or an attack.  Can you believe they are powering that thing using the Grid?  BEtcha there is one cable bringing the power as well, crossing miles of unguarded desert.  Rig up a coil and send huge voltage spikes down it all day..


Offline AmericanPatriot

  • Conservative Hero
  • ****
  • Posts: 2183
Re: $2 Billion NSA Spy Center is Going Up in Flames
« Reply #4 on: October 10, 2013, 08:55:16 AM »
As smart as these guys are, I'm sure they're doing their regular back ups

Online benb61

  • Established Member
  • ***
  • Posts: 1441
  • My 2 fast cars
Re: $2 Billion NSA Spy Center is Going Up in Flames
« Reply #5 on: October 10, 2013, 09:41:30 AM »
I think it is the hand of the Almighty!
Eschew Obfuscation

Offline Weisshaupt

  • Conservative Superhero
  • *****
  • Posts: 5731
Re: $2 Billion NSA Spy Center is Going Up in Flames
« Reply #6 on: October 10, 2013, 09:43:01 AM »
As smart as these guys are, I'm sure they're doing their regular back ups

The Backups that are important is 3 days worth of Diesel powered electricity.  If they loose the gird and are cut off, in 3 days they are done.

Offline LadyVirginia

  • Conservative Superhero
  • *****
  • Posts: 5168
  • Mt. Vernon painting by Francis Jukes
Re: $2 Billion NSA Spy Center is Going Up in Flames
« Reply #7 on: October 10, 2013, 08:03:47 PM »
O Schadenfreude, O Schadenfreude .....


that's a song I can dance to

 ::danceban:: ::danceban:: ::danceban::
"And for the support of this Declaration, with a firm reliance on the protection of divine Providence, we mutually pledge to each other our Lives, our Fortunes and our sacred Honor."